Date of Award | 30 Jun 2020 |
---|---|
Original language | English |
Supervisor | Pieter Pauwels (Supervisor 1), Theo A. Arentze (Supervisor 2) & Stijn van Schaijk (External coach) |
Construction cost estimating with Artificial Neural Networks: Utilising ANNs for conceptual construction cost estimation
Student thesis: Master