Date of Award | 31 Aug 2015 |
---|---|
Original language | English |
Supervisor | A.G. (Ton) de Kok (Supervisor 1) & W. (Michel) van der Borgh (Supervisor 2) |
Conceptual design of project business workstream guidelines into an integrated planning concept: a case study at a supplier to the construction industry
Student thesis: Master