Case study time driven acitvity based costing
: "you can't control what you don't measure and you can't manage what you don't control"

  • S.G.M. van den Dries

Student thesis: Master

Abstract

Date of Award31 May 2007
Original languageDutch
SupervisorF.P.D. van Bel (Supervisor 1)

Cite this

'