Date of Award | 29 Sept 2020 |
---|---|
Original language | English |
Supervisor | Qi Han (Supervisor 1), Pieter Pauwels (Supervisor 2) & Mike M. van Vliet (External coach) |
BIM-based building circularity assessment from the early design stages: a BIM-based framework for automating the building circularity assessment from different levels of a building’s composition and providing the decision-making support on the design of the circular building from the early design stages
Student thesis: Master