BeCoOLL, a cost of ownership model for an IC production facility

  • Raymond W.M. Geurts van Kessel

Student thesis: Master

Abstract

Date of Award28 Feb 2001
Original languageEnglish
SupervisorG.L.H. van Herel (Supervisor 1)

Cite this

BeCoOLL, a cost of ownership model for an IC production facility
Geurts van Kessel, R. W. M. (Author). 28 Feb 2001

Student thesis: Master