Date of Award | 31 Dec 1997 |
---|---|
Original language | English |
Supervisor | Emile H.L. Aarts (Supervisor 1) & P.C.J. Swinkels (Supervisor 2) |
A real-life pickup and delivery problem with multiple depots : from model to solution strategy
Student thesis: Master