Date of Award | 30 Sept 2008 |
---|---|
Original language | English |
Supervisor | G.P. Kiesmuller (Supervisor 1) & T. Tan (Supervisor 2) |
A new forecasting & inventory control system at NedTrain: for planned & unplanned material requirements
Student thesis: Master