Date of Award | 31 Aug 2016 |
---|---|
Original language | English |
Supervisor | Bauke de Vries (Supervisor 1), J. Beetz (Supervisor 2), C. Zhang (Supervisor 2) & T.F. Krijnen (Supervisor 2) |
A linked data approach for information integration between BIM and sensor data
Student thesis: Master