Abstract
Dynamic error budgeting is a tool for designing high-precision systems. Its application, based on practical rules, to the specification and design of an accurate XY-θ stage is presented. Itwas concluded that all specifications of the stage could be met using this method
| Original language | English |
|---|---|
| Pages (from-to) | 52-56 |
| Number of pages | 5 |
| Journal | Mikroniek |
| Volume | 5 |
| Issue number | 10 |
| Publication status | Published - 10 May 2010 |
| Externally published | Yes |
Bibliographical note
Patent of Bosch Rexroth and the authorsKeywords
- Modeling
- Control
- Gantry
- stages