The value of maintenance delay flexibility for improved spare parts inventory management

Rob J.I. Basten (Corresponding author), Jennifer K. Ryan (Corresponding author)

Research output: Contribution to journalArticleAcademicpeer-review

2 Citations (Scopus)
1 Downloads (Pure)

Abstract

Capital assets are typically maintained by replacing components with spare parts. Often, there is flexibility to delay planned, preventive maintenance when spare parts are required to perform more urgent unplanned, corrective maintenance. In this case, keeping a single stock of inventory to satisfy both types of demand can be beneficial. Therefore, we study a periodic review inventory system with a single stocking point and a zero replenishment lead time, used to meet lower-priority demands that are planned, as well as stochastic, high-priority demands. We study the impact of flexibility in performing planned maintenance on the optimal inventory policy. When planned maintenance may be delayed at most once, i.e., for one period, a myopic policy is optimal. When it may be delayed to the next period for an unlimited number of times, we characterize the structure of the optimal policy. We further propose two extensions, one in which delayed planned maintenance may become unplanned and one in which the total maintenance delay costs are increasing and convex in the number of delayed maintenance actions. Numerically, we find that allowing a single delay provides a system performance very close to that when unlimited delays are allowed. This result becomes even stronger in the context of the two model extensions. These results are important for practice, since maintenance managers are unlikely to accept the unlimited delay policy, while the one delay policy is likely to be more acceptable. Finally, we develop myopic heuristic policies and demonstrate that they perform quite close to optimal.

Original languageEnglish
Pages (from-to)646-657
Number of pages12
JournalEuropean Journal of Operational Research
Volume278
Issue number2
DOIs
Publication statusPublished - 16 Oct 2019

Fingerprint

Spare Parts
Inventory Management
Maintenance
Flexibility
Periodic Review
Preventive Maintenance
Preventive maintenance
Inventory Systems
Optimal Policy
Inventory management
Spare parts
System Performance
Managers
Likely
Policy
Heuristics
Costs
Zero

Keywords

  • Inventory
  • Maintenance flexibility
  • Spare parts

Cite this

@article{1356cd9093084619ad55fc974576bb21,
title = "The value of maintenance delay flexibility for improved spare parts inventory management",
abstract = "Capital assets are typically maintained by replacing components with spare parts. Often, there is flexibility to delay planned, preventive maintenance when spare parts are required to perform more urgent unplanned, corrective maintenance. In this case, keeping a single stock of inventory to satisfy both types of demand can be beneficial. Therefore, we study a periodic review inventory system with a single stocking point and a zero replenishment lead time, used to meet lower-priority demands that are planned, as well as stochastic, high-priority demands. We study the impact of flexibility in performing planned maintenance on the optimal inventory policy. When planned maintenance may be delayed at most once, i.e., for one period, a myopic policy is optimal. When it may be delayed to the next period for an unlimited number of times, we characterize the structure of the optimal policy. We further propose two extensions, one in which delayed planned maintenance may become unplanned and one in which the total maintenance delay costs are increasing and convex in the number of delayed maintenance actions. Numerically, we find that allowing a single delay provides a system performance very close to that when unlimited delays are allowed. This result becomes even stronger in the context of the two model extensions. These results are important for practice, since maintenance managers are unlikely to accept the unlimited delay policy, while the one delay policy is likely to be more acceptable. Finally, we develop myopic heuristic policies and demonstrate that they perform quite close to optimal.",
keywords = "Inventory, Maintenance flexibility, Spare parts",
author = "Basten, {Rob J.I.} and Ryan, {Jennifer K.}",
year = "2019",
month = "10",
day = "16",
doi = "10.1016/j.ejor.2019.04.023",
language = "English",
volume = "278",
pages = "646--657",
journal = "European Journal of Operational Research",
issn = "0377-2217",
publisher = "Elsevier",
number = "2",

}

The value of maintenance delay flexibility for improved spare parts inventory management. / Basten, Rob J.I. (Corresponding author); Ryan, Jennifer K. (Corresponding author).

In: European Journal of Operational Research, Vol. 278, No. 2, 16.10.2019, p. 646-657.

Research output: Contribution to journalArticleAcademicpeer-review

TY - JOUR

T1 - The value of maintenance delay flexibility for improved spare parts inventory management

AU - Basten, Rob J.I.

AU - Ryan, Jennifer K.

PY - 2019/10/16

Y1 - 2019/10/16

N2 - Capital assets are typically maintained by replacing components with spare parts. Often, there is flexibility to delay planned, preventive maintenance when spare parts are required to perform more urgent unplanned, corrective maintenance. In this case, keeping a single stock of inventory to satisfy both types of demand can be beneficial. Therefore, we study a periodic review inventory system with a single stocking point and a zero replenishment lead time, used to meet lower-priority demands that are planned, as well as stochastic, high-priority demands. We study the impact of flexibility in performing planned maintenance on the optimal inventory policy. When planned maintenance may be delayed at most once, i.e., for one period, a myopic policy is optimal. When it may be delayed to the next period for an unlimited number of times, we characterize the structure of the optimal policy. We further propose two extensions, one in which delayed planned maintenance may become unplanned and one in which the total maintenance delay costs are increasing and convex in the number of delayed maintenance actions. Numerically, we find that allowing a single delay provides a system performance very close to that when unlimited delays are allowed. This result becomes even stronger in the context of the two model extensions. These results are important for practice, since maintenance managers are unlikely to accept the unlimited delay policy, while the one delay policy is likely to be more acceptable. Finally, we develop myopic heuristic policies and demonstrate that they perform quite close to optimal.

AB - Capital assets are typically maintained by replacing components with spare parts. Often, there is flexibility to delay planned, preventive maintenance when spare parts are required to perform more urgent unplanned, corrective maintenance. In this case, keeping a single stock of inventory to satisfy both types of demand can be beneficial. Therefore, we study a periodic review inventory system with a single stocking point and a zero replenishment lead time, used to meet lower-priority demands that are planned, as well as stochastic, high-priority demands. We study the impact of flexibility in performing planned maintenance on the optimal inventory policy. When planned maintenance may be delayed at most once, i.e., for one period, a myopic policy is optimal. When it may be delayed to the next period for an unlimited number of times, we characterize the structure of the optimal policy. We further propose two extensions, one in which delayed planned maintenance may become unplanned and one in which the total maintenance delay costs are increasing and convex in the number of delayed maintenance actions. Numerically, we find that allowing a single delay provides a system performance very close to that when unlimited delays are allowed. This result becomes even stronger in the context of the two model extensions. These results are important for practice, since maintenance managers are unlikely to accept the unlimited delay policy, while the one delay policy is likely to be more acceptable. Finally, we develop myopic heuristic policies and demonstrate that they perform quite close to optimal.

KW - Inventory

KW - Maintenance flexibility

KW - Spare parts

UR - http://www.scopus.com/inward/record.url?scp=85065546975&partnerID=8YFLogxK

U2 - 10.1016/j.ejor.2019.04.023

DO - 10.1016/j.ejor.2019.04.023

M3 - Article

AN - SCOPUS:85065546975

VL - 278

SP - 646

EP - 657

JO - European Journal of Operational Research

JF - European Journal of Operational Research

SN - 0377-2217

IS - 2

ER -