Setting optimal planned leadtimes in configure-to-order assembly systems

Sjors Jansen (Corresponding author), Zümbül Atan, Ivo Adan, Ton de Kok

Research output: Contribution to journalArticleAcademicpeer-review

17 Citations (Scopus)
175 Downloads (Pure)

Abstract

We study a configure-to-order assembly system consisting of multiple parallel subassembly stages and one final assembly stage. Each stage has a stochastic leadtime. The system is controlled by planned leadtimes at each stage. Planned leadtimes are used to plan start and finish times at all stages. The system incurs holding cost for each stage from the planned start time of the stage until the final product is delivered to the customer. In addition, a penalty cost is incurred if the final assembly stage is late. The objective is to set the planned leadtimes for each stage such that the total expected cost is minimized. We prove that the optimal planned leadtimes satisfy a set of Newsvendor equations and show that the probability that a stage is “blamed” for the lateness of the system equals a Newsvendor fractile. We derive structural properties of the optimal solution and compare it with the optimal solution under an alternative holding cost regime.

Original languageEnglish
Article number2
Pages (from-to)585-595
Number of pages11
JournalEuropean Journal of Operational Research
Volume273
Issue number2
DOIs
Publication statusPublished - 1 Mar 2019

Keywords

  • Assembly systems
  • Newsvendor equations
  • Planned leadtimes
  • Supply chain management