Abstract
We describe an algorithm for solving a single machine scheduling problem with additional assumptions motivated by Magnetic Resonance Imaging (MRI) Systems. In the operating model, the setup times are sequence dependent and the objective is to minimize the total production time. An application of the algorithm to the real MRI examination results in an increase of the scanner workfow.
Original language | English |
---|---|
Title of host publication | Proceedings of the 3rd IEEE Multi-conference on Systems and Control (MSC 2009), 8-10 july 2009, St. Petersburg, Russia |
Place of Publication | Piscataway |
Publisher | Institute of Electrical and Electronics Engineers |
Pages | 867-872 |
ISBN (Print) | 978-1-4244-4601-8 |
DOIs | |
Publication status | Published - 2009 |