Skip to main navigation Skip to search Skip to main content

Process time information system (PTIS) for productivity improvement

  • Peter A. Erkelens
  • , Wim F. Schaefer

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

29 Downloads (Pure)

Abstract

The fast development of electronic data processing makes it possible to develop a process time information system for the construction industry. This system under development calculates process times in the project preparation phase and the construction phase and will contribute to productivity improvement. This paper gives an expose of research being undertaken.

Original languageEnglish
Title of host publicationIABSE Workshop Zurich 1986: organization of the design process - proceedings
Pages67-78
Number of pages12
DOIs
Publication statusPublished - 1 Dec 1986
EventIABSE Workshop Zurich 1986 -
Duration: 13 May 198613 May 1986

Workshop

WorkshopIABSE Workshop Zurich 1986
Period13/05/8613/05/86

Fingerprint

Dive into the research topics of 'Process time information system (PTIS) for productivity improvement'. Together they form a unique fingerprint.

Cite this