Abstract
Traditionally performance in construction is measured based on the "iron-triangle"- time, cost and
quality. In recent years indicators have been developed to include the measurements of other aspects
of project performance. The main shortcoming of these however is that most of them are lagging
indicators and hence are of little use for controlling the performance during the projects. This paper
reviews the existing key performance indicators, their types, use and shortcomings. The paper
describes a proposed conceptual framework for developing performance indicators for the pre-design
stage, of which the briefing process is an important part. In this framework a process mapping
methodology is suggested to identify the main activities that take place in the pre-design phase, the
dependencies between them and the stakeholders involved. Initial investigation of the proposed
framework has shown that it is a viable model that has already helped in identifying the relevant
processes of the pre-design phase and the related indicators.
| Original language | English |
|---|---|
| Title of host publication | ADAPTABLES 2006 : proceedings of the joint CIB, Tensinet, IASS international conference on adaptability in design and construction |
| Editors | F. Scheublin, A. Pronk |
| Place of Publication | Eindhoven |
| Publisher | Technische Universiteit Eindhoven |
| Pages | 11-15 |
| ISBN (Print) | 90-72152-03-4 |
| Publication status | Published - 2006 |
| Event | ADAPTABLES 2006 : joint CIB, Tensinet, IASS International Conference on Adaptability in Design and Construction, July 3-5, 2006, Eindhoven, The Netherlands - Eindhoven University of Technology, Eindhoven, Netherlands Duration: 3 Jul 2006 → 5 Jul 2006 |
Conference
| Conference | ADAPTABLES 2006 : joint CIB, Tensinet, IASS International Conference on Adaptability in Design and Construction, July 3-5, 2006, Eindhoven, The Netherlands |
|---|---|
| Country/Territory | Netherlands |
| City | Eindhoven |
| Period | 3/07/06 → 5/07/06 |
Fingerprint
Dive into the research topics of 'Process performance indicators in project pre-design stage'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver