Abstract
Only a few measurements are performed in the distribution networks nowadays. However, the distribution networks will have to handle future challenges, like increasing demands and distributed generation. Therefore, the network needs to be actively controlled and operated, which will require more operational measurements among the distribution network. Those measurements will also be necessary to increase the network utilization. This paper assesses the operational data which should be measured among the MV network to meet the future goals. Firstly, the functionality of future MV network is addressed and the relevant measurements are derived. The simulations are presented to evaluate the most suitable locations for the measurements. In addition, an overview of operational parameters and advisable measurement locations among the MV network is presented.
Original language | English |
---|---|
Title of host publication | Proceedings of the CIRED 2012 Workshop on Integration of Renewables into the Distribution Grid, 29-30 May 2012, Lisbon, Portugal |
Place of Publication | Piscataway |
Publisher | Institute of Electrical and Electronics Engineers |
ISBN (Print) | 978-1--84919-628-4 |
DOIs | |
Publication status | Published - 2012 |