Online scheduling of operations is essential to optimize productivity of flexible manufacturing systems (FMSs) where manufacturing requests arrive on the fly. An FMS processes products according to a particular flow through processing stations. This work focusses on online scheduling of re-entrant FMSs with flows using processing stations where products pass twice and with limited buffering between processing stations. This kind of FMS is modelled as a re-entrant flow shop with due dates and sequence-dependent set-up times. Such flow shops can benefit from minimization of the time penalties incurred from set-up times. On top of an existing greedy scheduling heuristic we apply a meta-heuristic that simultaneously explores several alternatives considering trade-offs between the used metrics by the scheduling heuristic. We identify invariants to efficiently remove many infeasible scheduling options so that the running time of online implementations is improved. The resulting algorithm is much faster than the state of the art and produces schedules with on average 4.6% shorter makespan.
Original language | English |
---|---|
Article number | 160 |
Number of pages | 20 |
Journal | ACM Transactions on Embedded Computing Systems |
Volume | 16 |
Issue number | 5s |
DOIs | |
Publication status | Published - Sept 2017 |
Event | 2017 International Conference on Hardware/Software Codesign and System Synthesis (CODES+ISSS 2017) - Seoul, Korea, Republic of Duration: 15 Oct 2017 → 20 Oct 2017 http://esweek.org/codes/about |
Keywords
- Re-entrant flow shops
- bounded horizon scheduling
- flexible manufacturing systems
- Bounded horizon scheduling
- Flexible manufacturing systems
Fingerprint
Dive into the research topics of 'Online scheduling of 2-re-entrant flexible manufacturing systems'. Together they form a unique fingerprint.Projects
- 1 Finished
-
CPS P1 - Integrated Scheduling and Control for Cyber-Physical Systems
Basten, A. A. (Project Manager) & van der Hagen, D. (Project communication officer)
1/01/14 → 31/08/19
Project: Research direct