Abstract
In this paper we present a model which unifies several existing models with respect to two phases of the planning process of a Flexible Manufacturing System. These phases are the system setup phase and the scheduling phase and in literature they usually are considered separately. We give a mathematical formulation encompassing both phases. From this formulation several existing approaches can be deduced. We also describe some heuristic methods for our model and present the computational results.
Original language | English |
---|---|
Pages (from-to) | 125-138 |
Number of pages | 14 |
Journal | Statistica Neerlandica |
Volume | 44 |
Issue number | 3 |
DOIs | |
Publication status | Published - 1990 |
Externally published | Yes |
Keywords
- batching
- combinatorics
- flexibility
- heuristics
- Hierarchical planning