Abstract
We present the first polynomial-time algorithm for an open-shop problem with unit execution times, arbitrary release dates, and due dates. The objective is to minimize maximum lateness
Original language | English |
---|---|
Pages (from-to) | 141-145 |
Journal | Naval Research Logistics |
Volume | 42 |
Issue number | 1 |
DOIs | |
Publication status | Published - 1995 |