Minimizing flow-time on unrelated machines

N. Bansal, J. Kulkarni

Research output: Book/ReportReportAcademic

90 Downloads (Pure)

Abstract

We consider some flow-time minimization problems in the unrelated machines setting. In this setting, there is a set of $m$ machines and a set of $n$ jobs, and each job $j$ has a machine dependent processing time of $p_{ij}$ on machine $i$. The flow-time of a job is the amount of time the job spends in the system (completion time minus its arrival time), and is one of the most natural quality of service measure. We show the following two results: an $O(\min(\log^2 n,\log n \log P))$ approximation algorithm for minimizing the total-flow time, and an $O(\log n)$ approximation for minimizing the maximum flow-time. Here $P$ is the ratio of maximum to minimum job size. These are the first known poly-logarithmic guarantees for both the problems.
Original languageEnglish
Publishers.n.
Number of pages17
Publication statusPublished - 2014

Publication series

NamearXiv.org
Volume1401.7284 [cs.DS]

Fingerprint Dive into the research topics of 'Minimizing flow-time on unrelated machines'. Together they form a unique fingerprint.

Cite this