Introduction of DG units in the network will result in increasing fault current levels. In this contribution several solutions are described to limit the fault currents in the network, in order to avoid overloading and destruction of components in the networks. The main focus of the paper is on the application of fault current limiters.
Original languageEnglish
Pages157-1/4
DOIs
Publication statusPublished - 2012

Fingerprint

Electric fault currents
Distributed power generation
Short circuit currents
Fault current limiters

Bibliographical note

Proceedings of the CIRED 2012 workshop on Integration of Renewables into the Distribution Grid, 29-30 May 2012, Lisbon

Cite this

@conference{c684a5bcff3e4e0bb5a4a922d1aa0cf7,
title = "Limitation of short-circuit power due to distributed generation",
abstract = "Introduction of DG units in the network will result in increasing fault current levels. In this contribution several solutions are described to limit the fault currents in the network, in order to avoid overloading and destruction of components in the networks. The main focus of the paper is on the application of fault current limiters.",
author = "J. Morren and T.J.M. Reckers and M.J.C. Berende and J.G. Slootweg",
note = "Proceedings of the CIRED 2012 workshop on Integration of Renewables into the Distribution Grid, 29-30 May 2012, Lisbon",
year = "2012",
doi = "10.1049/cp.2012.0779",
language = "English",
pages = "157--1/4",

}

Limitation of short-circuit power due to distributed generation. / Morren, J.; Reckers, T.J.M.; Berende, M.J.C.; Slootweg, J.G.

2012. 157-1/4.

Research output: Contribution to conferencePosterAcademic

TY - CONF

T1 - Limitation of short-circuit power due to distributed generation

AU - Morren, J.

AU - Reckers, T.J.M.

AU - Berende, M.J.C.

AU - Slootweg, J.G.

N1 - Proceedings of the CIRED 2012 workshop on Integration of Renewables into the Distribution Grid, 29-30 May 2012, Lisbon

PY - 2012

Y1 - 2012

N2 - Introduction of DG units in the network will result in increasing fault current levels. In this contribution several solutions are described to limit the fault currents in the network, in order to avoid overloading and destruction of components in the networks. The main focus of the paper is on the application of fault current limiters.

AB - Introduction of DG units in the network will result in increasing fault current levels. In this contribution several solutions are described to limit the fault currents in the network, in order to avoid overloading and destruction of components in the networks. The main focus of the paper is on the application of fault current limiters.

U2 - 10.1049/cp.2012.0779

DO - 10.1049/cp.2012.0779

M3 - Poster

SP - 157-1/4

ER -