Abstract
Barrage type tidal power plants can provide flexibility to the electricity grid thanks to the ability of hydraulic machines to be operated both as pumps and turbines. The added value of a fast switching tidal power plant is investigated within the project “Playing with Current(s)” (PwC), executed by universities, national knowledge institutes, utility companies and turbine manufacturers in The Netherlands. Necessary condition for grid-stabilisation is that a power plant can come online, from zero to full power within a very short timespan. As in the Netherlands power dispatching is done every 15 minutes, within the PwC project the maximum spin-up time is set ambitiously at 10 seconds. This paper covers the investigations of the transient behaviour of a tidal pumpturbine during start-up. As preliminary tests have shown that the full-load, passive ramping-up time of the tidal power plant is in the range of 20-30 seconds, two “kickstart” procedures have been proposed and investigated. During kickstart, the turbine is first operated as a pump to accelerate the water mass inside the duct to the desired full-load speed, and then switched from pump to turbine operation. Results are compared with the analytical solution of a simplified flow differential equation and with tests done with the Tidal Turbine Test Setup at HZ University of Applied Sciences. Results show that a kickstart with a frequency controller may reduce the ramping-up time to less than 10 seconds, which is sufficiently fast to operate the tidal power plant as a grid stabilisation facility.
| Original language | English |
|---|---|
| Title of host publication | 14th European Wave and Tidal Energy Conference, EWTEC 2021 |
| Number of pages | 9 |
| Publication status | Published - 2021 |
| Event | 14th European Wave and Tidal Energy Conference, EWTEC 2021 - Online, Plymouth, United Kingdom Duration: 5 Sept 2021 → 9 Sept 2021 Conference number: 14 https://ewtec.org/ewtec-2021/ |
Conference
| Conference | 14th European Wave and Tidal Energy Conference, EWTEC 2021 |
|---|---|
| Abbreviated title | EWTEC 2021 |
| Country/Territory | United Kingdom |
| City | Plymouth |
| Period | 5/09/21 → 9/09/21 |
| Internet address |
Bibliographical note
Funding Information:Paper ID 2212, conference track GPC This work was initiated by the HZ University of Applied Sciences and supported by the Dutch RAAK PRO program under SiA grant. In addition, the work was supported by the experimental data collected by the turbine manufacturer Nijhuis Pompen, the Ministry of Infrastructure and Water Management, the regional energy and network companies, infrastructure companies and environmental research institutes.
Funding
Paper ID 2212, conference track GPC This work was initiated by the HZ University of Applied Sciences and supported by the Dutch RAAK PRO program under SiA grant. In addition, the work was supported by the experimental data collected by the turbine manufacturer Nijhuis Pompen, the Ministry of Infrastructure and Water Management, the regional energy and network companies, infrastructure companies and environmental research institutes.
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- Grid balancing
- Kickstart
- Tidal power
Fingerprint
Dive into the research topics of 'Kickstart procedure of a tidal power plant'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver