Abstract
Standard software for decision support in production control tasks is commonly structured according to the hierarchical production planning (HPP) concept. However, in a focused factory one planner may carry out planning, scheduling and dispatching. This paper presents a case study where one integrated planner is responsible for planning, scheduling and dispatching. Hence, the integrated planner needs a seamless system from the generation from the daily level through the generation of the 5-year-plan. This paper presents a design of a decision support system for the integrated planner.
| Original language | English |
|---|---|
| Pages (from-to) | 5-14 |
| Journal | Computers in Industry |
| Volume | 50 |
| Issue number | 1 |
| DOIs | |
| Publication status | Published - 2003 |