T1 - Decision support systems for production scheduling tasks : part I of a case study : analysis and task redesign
AU - Wiers, V.C.S.
PY - 1997
Y1 - 1997
N2 - The first three steps of a new design method for decision support systems in production scheduling tasks are applied to a large bulk terminal. The operational characteristics of the company largely correspond with those of typical semiprocess industries. The design model used consists of five steps: production analysis, task analysis, task redesign, decision support design and decision support implementation. The results of the application of the design model up to the task redesign step are described
AB - The first three steps of a new design method for decision support systems in production scheduling tasks are applied to a large bulk terminal. The operational characteristics of the company largely correspond with those of typical semiprocess industries. The design model used consists of five steps: production analysis, task analysis, task redesign, decision support design and decision support implementation. The results of the application of the design model up to the task redesign step are described
U2 - 10.1080/095372897234821
DO - 10.1080/095372897234821
M3 - Article
SN - 0953-7287
VL - 8
SP - 711
EP - 721
JO - Production Planning & Control
JF - Production Planning & Control
IS - 7
ER -