Abstract
In the Netherlands, large public customers use integrated contracts more and more often for complicated civil engineering and architectural works. Projects with integrated contracts such as Design, Build, Finance, Maintenance and Operate require tenderers to behave differently than they are accustomed to in traditional projects. This paper discusses the different requirements tenderers have to meet in terms of communication with their customers in order to create sufficient customer value in projects with integrated contracts. Customer value theories provide insight into the elements of these contracts that demand greater attention. Application of these elements in a case study shows that responsiveness, interaction moments and visualisation are the primary ‘soft elements’ that can bring about improvements in the communication with public customers.
| Original language | English |
|---|---|
| Title of host publication | CIB Joint International Symposium: Construction Facing Worldwide Challenges |
| Editors | A. Ceric, M. Radujkovic |
| Place of Publication | Dubrovnik |
| Publisher | International Council for Research and Innovation in Building and Construction (CIB) |
| Pages | 1-8 |
| Publication status | Published - 2009 |
| Event | conference; CIB Joint International Symposium: Construction Facing Worldwide Challenges; 2009-09-27; 2009-10-01 - Duration: 27 Sept 2009 → 1 Oct 2009 |
Conference
| Conference | conference; CIB Joint International Symposium: Construction Facing Worldwide Challenges; 2009-09-27; 2009-10-01 |
|---|---|
| Period | 27/09/09 → 1/10/09 |
| Other | CIB Joint International Symposium: Construction Facing Worldwide Challenges |
Fingerprint
Dive into the research topics of 'Customer Attraction in a Design-Build-Finance-Maintain-Operate Contract'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver