Corrigendum to “Characterizing and structuring a new make-to-forecast production strategy” [J. Oper. Manage. 25 (3) (2007) 623–642]

J. Meredith, U. Akinc, B. Zwartele, J. Arts

Research output: Contribution to journalArticleAcademicpeer-review

Abstract

This Erratum corrects some of the values in Table 2 of our previous manuscript. The corrections do not change the paper's original conclusions that more sophisticated heuristic rules perform better, but with the better contributions of the heuristic rules, the optimization rules’ improvements are now more modest.
Original languageEnglish
Pages (from-to)59-60
JournalJournal of Operations Management
Volume37
DOIs
Publication statusPublished - Jul 2015

Fingerprint

Dive into the research topics of 'Corrigendum to “Characterizing and structuring a new make-to-forecast production strategy” [J. Oper. Manage. 25 (3) (2007) 623–642]'. Together they form a unique fingerprint.

Cite this