TY - JOUR
T1 - Corrigendum to “Characterizing and structuring a new make-to-forecast production strategy” [J. Oper. Manage. 25 (3) (2007) 623–642]
AU - Meredith, J.
AU - Akinc, U.
AU - Zwartele, B.
AU - Arts, J.
PY - 2015/7
Y1 - 2015/7
N2 - This Erratum corrects some of the values in Table 2 of our previous manuscript. The corrections do not change the paper's original conclusions that more sophisticated heuristic rules perform better, but with the better contributions of the heuristic rules, the optimization rules’ improvements are now more modest.
AB - This Erratum corrects some of the values in Table 2 of our previous manuscript. The corrections do not change the paper's original conclusions that more sophisticated heuristic rules perform better, but with the better contributions of the heuristic rules, the optimization rules’ improvements are now more modest.
U2 - 10.1016/j.jom.2015.05.002
DO - 10.1016/j.jom.2015.05.002
M3 - Article
SN - 0272-6963
VL - 37
SP - 59
EP - 60
JO - Journal of Operations Management
JF - Journal of Operations Management
ER -