Abstract
In order to meet service level agreements at minimal cost, Original Equipment Manufacturers (OEMs) use spare parts planning models to determine the optimal base stock levels at the warehouses in their service network. In practice, however, these optimized base stock levels result in a realized performance that deviates from the expected performance. Therefore, it is beneficial for these companies to evaluate the base stock levels in terms of service performance, inventory value, and costs. In order to measure this planning performance, we developed a digital twin that is able to measure the planning performance and identify root causes for the performance gap. Our digital twin helped ASML, an OEM in the semiconductor industry, to create a feedback loop between the spare parts planning model and its realized performance in practice, providing a mechanism to learn from past results and determine actions to close the gap between the expected and realized performance.
Original language | English |
---|---|
Title of host publication | Proceedings of the 2022 Winter Simulation Conference |
Editors | B. Feng, G. Pedrielli, Y. Peng, S. Shashaani, E. Song, C.G. Corlu, L.H. Lee, E.P. Chew, T. Roeder, P. Lendermann |
Publisher | Institute of Electrical and Electronics Engineers |
Pages | 1533-1544 |
Number of pages | 12 |
ISBN (Electronic) | 978-1-6654-7661-4 |
DOIs | |
Publication status | Published - 23 Jan 2023 |
Event | 2022 Winter Simulation Conference, WSC 2022: Reimagine Tomorrow - Singapore, Singapore Duration: 11 Dec 2022 → 14 Dec 2022 https://meetings.informs.org/wordpress/wsc2022/ |
Conference
Conference | 2022 Winter Simulation Conference, WSC 2022 |
---|---|
Country/Territory | Singapore |
City | Singapore |
Period | 11/12/22 → 14/12/22 |
Internet address |
Keywords
- maintenance
- spare parts