Capacity assignment in repair shops with high material uncertainty

Maarten Driessen (Corresponding author), Geert-Jan van Houtum, Henk Zijm, W.D. (Jan Willem) Rustenburg

Research output: Contribution to journalArticleAcademicpeer-review

19 Downloads (Pure)

Abstract

We consider a group of identical systems, each consisting of multiple Line Replaceable Units (LRUs) that fail according to a Poisson process. A failed LRU is replaced by a ready-for-use one from a single stock point and, if not available, a backorder cost is incurred per unit of time. The failed LRU is returned to a repair shop, where it is inspected to identify which Shop Replaceable Units (SRUs) caused the failure, and is repaired by replacing the failed SRUs. After repair the LRU is ready-for-use again. Both the LRUs and SRUs are controlled by base stock policies. The repair shop is modeled as a two-stage service process consisting of an inspection and a repair phase. Inspection and repair are executed by one group of repairmen. The repair times depend on the time that elapses between inspection and the repair of a part. We model the total repair capacity as a single server and we compare policies that, based on the repair workload in the repair shop, give priority to either inspection or repair of parts. We suggest two
approaches to set the SRU base stock levels, and simulate the system for multiple combinations of the repair workload threshold and predetermined vectors of SRU base stock levels. Based on the simulation results, the LRU base stock levels are optimized. We study a representative setting in which the repair shop faces a high material uncertainty, under different scenarios. We show that a scenario in which we maximize the SRU job completeness, combined with a repair priority policy (in which repair of jobs takes precedence over inspection of jobs) leads to the
lowest total costs.
Original languageEnglish
Article number107484
Number of pages11
JournalInternational Journal of Production Economics
Volume221
Issue number1
DOIs
Publication statusPublished - 5 Mar 2020

    Fingerprint

Keywords

  • Repairable spare parts
  • Multi-item
  • indenture levels
  • priorities
  • simulation
  • Priorities
  • Two-stage repair system
  • Simulation
  • Multi-item two-indenture system

Cite this