Abstract

We consider a group of identical systems, each consisting of multiple Line Replaceable Units (LRUs) that fail according to a Poisson process. A failed LRU is replaced by a ready-for-use one from a single stock point and, if not available, a backorder cost is incurred per unit of time. The failed LRU is returned to a repair shop, where it is inspected to identify which Shop Replaceable Units (SRUs) caused the failure, and is repaired by replacing the failed SRUs. After repair the LRU is ready-for-use again. Both the LRUs and SRUs are controlled by base stock policies. The repair shop is modeled as a two-stage service process consisting of an inspection and a repair phase. Inspection and repair are executed by one group of repairmen. The repair times depend on the time that elapses between inspection and the repair of a part. We model the total repair capacity as a single server and we compare policies that, based on the repair workload in the repair shop, give priority to either inspection or repair of parts. We suggest two
approaches to set the SRU base stock levels, and simulate the system for multiple combinations of the repair workload threshold and predetermined vectors of SRU base stock levels. Based on the simulation results, the LRU base stock levels are optimized. We study a representative setting in which the repair shop faces a high material uncertainty, under different scenarios. We show that a scenario in which we maximize the SRU job completeness, combined with a repair priority policy (in which repair of jobs takes precedence over inspection of jobs) leads to the
lowest total costs.
Original languageEnglish
Number of pages31
JournalInternational Journal of Production Economics
DOIs
Publication statusAccepted/In press - 9 Sep 2019

Fingerprint

Repair
Inspection
Uncertainty
Assignment
Costs
Servers

Keywords

  • Repairable spare parts
  • Multi-item
  • indenture levels
  • priorities
  • simulation
  • Priorities
  • Two-stage repair system
  • Simulation
  • Multi-item two-indenture system

Cite this

@article{567216119ebe4bb2a0d181224b348f96,
title = "Capacity assignment in repair shops with high material uncertainty",
abstract = "We consider a group of identical systems, each consisting of multiple Line Replaceable Units (LRUs) that fail according to a Poisson process. A failed LRU is replaced by a ready-for-use one from a single stock point and, if not available, a backorder cost is incurred per unit of time. The failed LRU is returned to a repair shop, where it is inspected to identify which Shop Replaceable Units (SRUs) caused the failure, and is repaired by replacing the failed SRUs. After repair the LRU is ready-for-use again. Both the LRUs and SRUs are controlled by base stock policies. The repair shop is modeled as a two-stage service process consisting of an inspection and a repair phase. Inspection and repair are executed by one group of repairmen. The repair times depend on the time that elapses between inspection and the repair of a part. We model the total repair capacity as a single server and we compare policies that, based on the repair workload in the repair shop, give priority to either inspection or repair of parts. We suggest twoapproaches to set the SRU base stock levels, and simulate the system for multiple combinations of the repair workload threshold and predetermined vectors of SRU base stock levels. Based on the simulation results, the LRU base stock levels are optimized. We study a representative setting in which the repair shop faces a high material uncertainty, under different scenarios. We show that a scenario in which we maximize the SRU job completeness, combined with a repair priority policy (in which repair of jobs takes precedence over inspection of jobs) leads to thelowest total costs.",
keywords = "Repairable spare parts, Multi-item, indenture levels, priorities, simulation, Priorities, Two-stage repair system, Simulation, Multi-item two-indenture system",
author = "Maarten Driessen and {van Houtum}, Geert-Jan and Henk Zijm and Rustenburg, {W.D. (Jan Willem)}",
year = "2019",
month = "9",
day = "9",
doi = "10.1016/j.ijpe.2019.09.005",
language = "English",
journal = "International Journal of Production Economics",
issn = "0925-5273",
publisher = "Elsevier",

}

Capacity assignment in repair shops with high material uncertainty. / Driessen, Maarten (Corresponding author); van Houtum, Geert-Jan; Zijm, Henk; Rustenburg, W.D. (Jan Willem).

In: International Journal of Production Economics, 09.09.2019.

Research output: Contribution to journalArticleAcademicpeer-review

TY - JOUR

T1 - Capacity assignment in repair shops with high material uncertainty

AU - Driessen, Maarten

AU - van Houtum, Geert-Jan

AU - Zijm, Henk

AU - Rustenburg, W.D. (Jan Willem)

PY - 2019/9/9

Y1 - 2019/9/9

N2 - We consider a group of identical systems, each consisting of multiple Line Replaceable Units (LRUs) that fail according to a Poisson process. A failed LRU is replaced by a ready-for-use one from a single stock point and, if not available, a backorder cost is incurred per unit of time. The failed LRU is returned to a repair shop, where it is inspected to identify which Shop Replaceable Units (SRUs) caused the failure, and is repaired by replacing the failed SRUs. After repair the LRU is ready-for-use again. Both the LRUs and SRUs are controlled by base stock policies. The repair shop is modeled as a two-stage service process consisting of an inspection and a repair phase. Inspection and repair are executed by one group of repairmen. The repair times depend on the time that elapses between inspection and the repair of a part. We model the total repair capacity as a single server and we compare policies that, based on the repair workload in the repair shop, give priority to either inspection or repair of parts. We suggest twoapproaches to set the SRU base stock levels, and simulate the system for multiple combinations of the repair workload threshold and predetermined vectors of SRU base stock levels. Based on the simulation results, the LRU base stock levels are optimized. We study a representative setting in which the repair shop faces a high material uncertainty, under different scenarios. We show that a scenario in which we maximize the SRU job completeness, combined with a repair priority policy (in which repair of jobs takes precedence over inspection of jobs) leads to thelowest total costs.

AB - We consider a group of identical systems, each consisting of multiple Line Replaceable Units (LRUs) that fail according to a Poisson process. A failed LRU is replaced by a ready-for-use one from a single stock point and, if not available, a backorder cost is incurred per unit of time. The failed LRU is returned to a repair shop, where it is inspected to identify which Shop Replaceable Units (SRUs) caused the failure, and is repaired by replacing the failed SRUs. After repair the LRU is ready-for-use again. Both the LRUs and SRUs are controlled by base stock policies. The repair shop is modeled as a two-stage service process consisting of an inspection and a repair phase. Inspection and repair are executed by one group of repairmen. The repair times depend on the time that elapses between inspection and the repair of a part. We model the total repair capacity as a single server and we compare policies that, based on the repair workload in the repair shop, give priority to either inspection or repair of parts. We suggest twoapproaches to set the SRU base stock levels, and simulate the system for multiple combinations of the repair workload threshold and predetermined vectors of SRU base stock levels. Based on the simulation results, the LRU base stock levels are optimized. We study a representative setting in which the repair shop faces a high material uncertainty, under different scenarios. We show that a scenario in which we maximize the SRU job completeness, combined with a repair priority policy (in which repair of jobs takes precedence over inspection of jobs) leads to thelowest total costs.

KW - Repairable spare parts

KW - Multi-item

KW - indenture levels

KW - priorities

KW - simulation

KW - Priorities

KW - Two-stage repair system

KW - Simulation

KW - Multi-item two-indenture system

UR - http://www.scopus.com/inward/record.url?scp=85072221086&partnerID=8YFLogxK

U2 - 10.1016/j.ijpe.2019.09.005

DO - 10.1016/j.ijpe.2019.09.005

M3 - Article

JO - International Journal of Production Economics

JF - International Journal of Production Economics

SN - 0925-5273

ER -