Abstract
This paper presents a method to automatically derive all the feasible sub-assemblies and transitions between them from assembly drawings. The method uses representation of the precedence relations via Boolean expressions. As a result, the transition matrix is automatically generated, representing the assembly's structure in the optimal disassembly sequence generation procedure. The method is applied to an assembly from industry.
| Original language | English |
|---|---|
| Title of host publication | Proceedings of ISATP '01, 4th IEEE International Symposium on Assembly and Task Planning, Fukuoka, Japan, May 28-30 |
| Place of Publication | Fukuoka |
| Publisher | Institute of Electrical and Electronics Engineers |
| Pages | 220-225 |
| Number of pages | 6 |
| ISBN (Print) | 0-7803-7004-X |
| DOIs | |
| Publication status | Published - 2001 |