@book{7c28d6068bb642ea95bed4679dc8b098,
title = "Attaining stability in multi-skill workforce scheduling",
abstract = "In this paper, we define a set inequalities that are satisfied by stable multi-skill workforce schedules. In our analysis, a schedule is said to be stable if it does not contain a blocking pair, extending the notion of blocking pair in the Marriage Model of Gale-Shapley. Skill efficiency is chosen as the criterion in the preference structure. The proposed algorithm either constructs a stable multi-skill workforce schedule or decides that no stable schedule exists.",
author = "M. Firat and C.A.J. Hurkens",
year = "2010",
language = "English",
isbn = "978-90-386-2404-4",
series = "BETA publicatie : working papers",
publisher = "Technische Universiteit Eindhoven",
}