An exact algorithm for parallel machine scheduling with conflicts

  • Daniel Kowalczyk
  • , Roel Leus

Research output: Contribution to journalArticleAcademicpeer-review

27 Citations (Scopus)

Abstract

We consider an extension of classic parallel machine scheduling where a set of jobs is scheduled on identical parallel machines and an undirected conflict graph is part of the input. Each node in the graph represents a job, and an edge implies that its two jobs are conflicting, meaning that they cannot be scheduled on the same machine. The goal is to find an assignment of the jobs to the machines such that the maximum completion time (makespan) is minimized. We present an exact algorithm based on branch and price that combines methods from bin packing, scheduling, and graph coloring, with appropriate modifications. The algorithm has a good computational performance even for parallel machine scheduling without conflicting jobs.
Original languageEnglish
Pages (from-to)355-372
Number of pages18
JournalJournal of Scheduling
Volume20
Issue number4
DOIs
Publication statusPublished - 1 Aug 2017
Externally publishedYes

Fingerprint

Dive into the research topics of 'An exact algorithm for parallel machine scheduling with conflicts'. Together they form a unique fingerprint.

Cite this