An alternative to safety stock policies for multi-level rolling schedule MRP problems

N.P. Dellaert, J. Jeunet

Research output: Contribution to journalArticleAcademicpeer-review

10 Citations (Scopus)
11 Downloads (Pure)

Abstract

We study the impact of positive lead times on the multi-level lot-sizing problem in a rolling schedule environment. We show how stockout situations may arise even in a context of deterministic demand. We therefore develop a procedure to avoid such stockouts and we compare its performance through a simulation study to a safety stock strategy. Simulation results show the superiority of the proposed procedure.
Original languageEnglish
Pages (from-to)751-768
JournalEuropean Journal of Operational Research
Volume163
Issue number3
DOIs
Publication statusPublished - 2005

Fingerprint

Dive into the research topics of 'An alternative to safety stock policies for multi-level rolling schedule MRP problems'. Together they form a unique fingerprint.

Cite this