Alternative approach for a total integrated secondary installation in MV substations covering all possible and required functions

M.J.M. van Riet, F.L. Baldinger, W.M. Buijtenen, van, F.T.J. Erp, van, F. Volberda, F. Provoost

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

1 Downloads (Pure)

Abstract

A simple, flexible and cheap automation concept for MV substations has been developed. The concept consists of a fully integrated system, containing accurate data acquisition, metering, protection and control. It is in line with IEC 61850. The basics of the system were fully type tested during 2004. In 2005 it will be implemented in two substations in order to proof the data acquisition in combination with several central monitoring systems within the company. The next step will be the integration with protection and control in 2006. As from 2007 this system will be used during substation refurbishment.
Original languageEnglish
Title of host publication18th International Conference on Electricity Distribution, Turin, Italy, 6-9 June 2005, CIRED 2005, Turin, Italy
PublisherInstitute of Electrical Engineers
ISBN (Electronic) 978-0-86341-534-0
DOIs
Publication statusPublished - 2005
Event18th International Conference and Exhibition on Electricity Distribution (CIRED 2005) - Turin, Italy
Duration: 6 Jun 20059 Jun 2005
Conference number: 18

Publication series

NameIEE Colloquium Digest
PublisherIEE
Volume11034
ISSN (Print)0963-3308

Conference

Conference18th International Conference and Exhibition on Electricity Distribution (CIRED 2005)
Abbreviated titleCIRED 2005
Country/TerritoryItaly
CityTurin
Period6/06/059/06/05

Fingerprint

Dive into the research topics of 'Alternative approach for a total integrated secondary installation in MV substations covering all possible and required functions'. Together they form a unique fingerprint.

Cite this