TY - JOUR
T1 - Advances in moment transferring dvw reinforced timber connections : numerical analyses and verification, Part 2
AU - Brandon, D.
AU - Leijten, A.J.M.
PY - 2014
Y1 - 2014
N2 - This study focuses on the numerical simulation of the dvw reinforced timber connection with expanded tubes. In Part 1 it was shown that two connections, acting together in series, have the same rotational stiffness as one separate connection. Numerical analyses presented in this part (Part 2) confirm these findings. Additionally, several failure modes are studied, which can play an important role in the behaviour of the connection such as possible failures of the constituent materials and failure of the bond between the timber and its reinforcement. For evaluating the latter, special attention is given to the type of adhesive, the glue-line thickness and the peak shear stresses. The simulations are validated by experiments.
AB - This study focuses on the numerical simulation of the dvw reinforced timber connection with expanded tubes. In Part 1 it was shown that two connections, acting together in series, have the same rotational stiffness as one separate connection. Numerical analyses presented in this part (Part 2) confirm these findings. Additionally, several failure modes are studied, which can play an important role in the behaviour of the connection such as possible failures of the constituent materials and failure of the bond between the timber and its reinforcement. For evaluating the latter, special attention is given to the type of adhesive, the glue-line thickness and the peak shear stresses. The simulations are validated by experiments.
U2 - 10.1016/j.conbuildmat.2014.01.026
DO - 10.1016/j.conbuildmat.2014.01.026
M3 - Article
SN - 0950-0618
VL - 56
SP - 32
EP - 43
JO - Construction and Building Materials
JF - Construction and Building Materials
M1 - 2
ER -