A resource constrained project scheduling problem with multi-modes

C. Altintas (Corresponding author), Meral Azizoglu (Corresponding author)

Research output: Contribution to journalArticleAcademicpeer-review

Abstract

In this study, the authors consider a project scheduling problem with a single non-renewable resource. The authors assume that the resource is released at scheduled times and specified quantities and the resource is consumed at activity completion. The activities can be processed at different modes where a mode is defined by a processing time and a resource requirement amount. The problem is to select the modes and timings of the activities so as to minimize the project completion time. The authors give a mixed integer linear programming model and discuss some variable elimination mechanisms to enhance its efficiency.
Original languageEnglish
Article number4
Pages (from-to)55-70
Number of pages16
JournalInternational Journal of Information Technology Project Management
Volume11
Issue number1
DOIs
Publication statusPublished - 1 Jan 2020

Keywords

  • Multi-Modes
  • Non-Renewable Resource
  • Programming Model
  • Project Scheduling

Fingerprint Dive into the research topics of 'A resource constrained project scheduling problem with multi-modes'. Together they form a unique fingerprint.

Cite this