Abstract
We simulate the performance of a simple production system in which due-dates are set internally. We investigate priority rules aimed at minimizing tardiness, emphasizing a "modified duedate rule" which functions effectively in conjunction with internally-set deadlines and which adapts to both tight and loose conditions in the due-dates. This rule is simple and logical, and shows considerable promise for application in complex production systems.
Original language | English |
---|---|
Pages (from-to) | 37-42 |
Number of pages | 6 |
Journal | Journal of Operations Management |
Volume | 3 |
Issue number | 1 |
DOIs | |
Publication status | Published - 1982 |