If you made any changes in Pure these will be visible here soon.

Research Output 1991 2019

2019

Coordinating failed goods collecting and repair capacity policies in the maintenance of commoditized capital hoods

van Ooijen, H. P. G., Bertrand, J. W. M. & Büyükkaramikli, N. C., 1 Feb 2019, In : International Journal of Production Economics. 208, p. 29-42 14 p.

Research output: Contribution to journalArticleAcademicpeer-review

Repair
Logistics
Costs
Availability
Logistics service providers
2018

The effect of due-date driven capacity adjustments on delivery performance and costs in job shops with exogenous due-dates

van Ooijen, H. P. G. & Bertrand, J. W. M., Feb 2018, 20th International Working Seminar on Production Economics. 10 p.

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademic

2015
7 Citations (Scopus)

Integrating inventory control and capacity management at a maintenance service provider

Buyukkaramikli, N. C., Ooijen, van, H. P. G. & Bertrand, J. W. M., 2015, In : Annals of Operations Research. 231, 1, p. 185-206

Research output: Contribution to journalArticleAcademicpeer-review

Inventory control
Capacity management
Service provider
Repair
Savings
2013
4 Citations (Scopus)

Flexible hiring in a make to order system with parallel processing units

Büyükkaramikli, N. C., Bertrand, J. W. M. & Ooijen, van, H. P. G., 2013, In : Annals of Operations Research. 209, 1, p. 159-178 20 p.

Research output: Contribution to journalArticleAcademicpeer-review

Make-to-order
Hiring
Costs
Parallel processing
Order systems
6 Citations (Scopus)

Periodic capacity management under a lead-time performance constraint

Büyükkaramikli, N. C., Bertrand, J. W. M. & Ooijen, van, H. P. G., 2013, In : OR Spektrum. 35, 1, p. 221-249 29 p.

Research output: Contribution to journalArticleAcademicpeer-review

Open Access
File
Lead time
Capacity management
Costs
Savings
Queuing system
2012

Capacity flexibility of a maintenance service provider in specialized and commoditized system environments

Büyükkaramikli, N. C., 2012, Eindhoven: Technische Universiteit Eindhoven. 196 p.

Research output: ThesisPhd Thesis 1 (Research TU/e / Graduation TU/e)Academic

Open Access
File
Repair
Costs
Sales
Wages
Personnel
2 Citations (Scopus)

The capacity investment decision for make-to-order production systems with demand rate control

Bertrand, J. W. M. & Ooijen, van, H. P. G., 2012, In : International Journal of Production Economics. 137, 2, p. 272-283 12 p.

Research output: Contribution to journalArticleAcademicpeer-review

Profitability
Sales
Stochastic models
Textile printing
Food processing
2011

From lagging indicators to leading indicators: design of a leading indicator dashboard for Philips Lighting

Cai, Y. & Technische Universiteit Eindhoven (TUE). Stan Ackermans Instituut. Logistics Management Systems (LMS), 2011, Eindhoven: Technische Universiteit Eindhoven.

Research output: ThesisPd Eng ThesisAcademic

Leading indicators
Supply chain
Replenishment
Managers
Transparency
Open Access
File
2009
1 Citation (Scopus)

A computational comparison of cyclical and non-cyclical control for stochastic production-inventory systems

Nyen, van, P. L. M., Bertrand, J. W. M. & Ooijen, van, H. P. G., 2009, In : International Journal of Production Research. 47, 16, p. 4609-4627

Research output: Contribution to journalArticleAcademicpeer-review

Planning
Decision support systems
Production-inventory system
Production planning
Simulation

Supplier managed inventory in the OEM supply chain: The impact of relationship types on total costs and cost distribution

Van Nyen, P. L. M., Bertrand, J. W. M., Van Ooijen, H. P. G. & Vandaele, N. J., 1 Dec 2009, Supply Chain Planning: Quantitative Decision Support and Advanced Planning Solutions. Günther, H. O. & Meyr, H. (eds.). Berlin: Springer, p. 219-246 28 p.

Research output: Chapter in Book/Report/Conference proceedingChapterAcademicpeer-review

Distribution costs
Suppliers
Costs
Supply chain
Inventory cost
5 Citations (Scopus)

Supplier managed inventory in the OEM supply chain : the impact of relationship types on total costs and cost distribution

Nyen, van, P. L. M., Bertrand, J. W. M., Ooijen, van, H. P. G. & Vandaele, N. J., 2009, In : OR Spektrum. 31, 1, p. 167-194 28 p.

Research output: Contribution to journalArticleAcademicpeer-review

Suppliers
Costs
Supply chain
Distribution costs
Original equipment manufacturers
2008

Designing a logistic control system: dealing with changes in Fokker's sheet metal unit

Gomes, J. & Technische Universiteit Eindhoven (TUE). Stan Ackermans Instituut. Logistics Management Systems (LMS), 2008, Eindhoven: Technische Universiteit Eindhoven.

Research output: ThesisPd Eng ThesisAcademic

Sheet metal
Logistics
Control systems
Warehouses
Aluminum sheet
16 Citations (Scopus)
Lead
Costs
Throughput
Cost reduction
Tardiness
2007

Planning and control of the intercontinental goods flows at Exerion Precision Technology

Otáhalová, A. & Technische Universiteit Eindhoven (TUE). Stan Ackermans Instituut. Logistics Management Systems (LMS), 2007, Eindhoven: Technische Universiteit Eindhoven.

Research output: ThesisPd Eng ThesisAcademic

Planning
Decision making
Logistics
Inventory control
Visibility
2006
11 Citations (Scopus)

A heuristic to control integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times

Van Nyen, P. L. M., Bertrand, J. W. M., Van Ooijen, H. P. G. & Vandaele, N. J., 1 Dec 2006, Stochastic Modeling of Manufacturing Systems: Advances in Design, Performance Evaluation, and Control Issues. Liberopulos, G., Papadopoulos, C. T., Tan, B., MacGregor Smith, J. & Gershwin, S. B. (eds.). Berlin: Springer, p. 253-288 36 p.

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

Integrated
Heuristics
Routing
Job shop
Production-inventory system

Economic evaluation of workload control effects

Ooijen, van, H. P. G. & Bertrand, W., 2006, Production Economics : Proceedings of the 14th International Working Seminar. Amsterdam: Elsevier, p. 339-348

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Logistics design project at EPT

Musalkova, R. & Technische Universiteit Eindhoven (TUE). Stan Ackermans Instituut. Logistics Management Systems (LMS), 2006, Eindhoven: Technische Universiteit Eindhoven.

Research output: ThesisPd Eng ThesisAcademic

Organizing parts production at Exerion Precision Technologies

Nellar, G. G. & Technische Universiteit Eindhoven (TUE). Stan Ackermans Instituut. Logistics Management Systems (LMS), 2006, Eindhoven: Technische Universiteit Eindhoven.

Research output: ThesisPd Eng ThesisAcademic

2005
11 Citations (Scopus)

A heuristic to contol integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times

Nyen, van, P. L. M., Bertrand, J. W. M., Ooijen, van, H. P. G. & Vandaele, N. J., 2005, In : OR Spektrum. 27, 2-3, p. 399-434

Research output: Contribution to journalArticleAcademicpeer-review

Production-inventory system
Integrated
Routing
Job shop
Heuristics

Kostenbesparing in de aanvoerlogistiek van bloed

van Bussel, L. M., 2005, Eindhoven: Technische Universiteit Eindhoven.

Research output: ThesisPd Eng ThesisAcademic

The integrated control of production-inventory systems

Van Nyen, P. L. M., 2005, Eindhoven: Technische Universiteit Eindhoven. 279 p.

Research output: ThesisPhd Thesis 1 (Research TU/e / Graduation TU/e)Academic

Open Access
File
Integrated
Production-inventory system
Production planning
Costs
Schedule

The value of coordination in manufacturer-customer relationships

Nyen, van, P. L. M., Bertrand, J. W. M., Ooijen, van, H. P. G. & Vandaele, N. J., 2005, Eindhoven: Technische Universiteit Eindhoven. 29 p. (BETA publicatie : working papers; vol. 151)

Research output: Book/ReportReportAcademic

Open Access
File
Customer relationship
Vendor managed inventory
Costs
Production and inventory control
Cost savings
2004

Detailed design and implementation of a one-piece flow assembly process

Kapys, Y. & Technische Universiteit Eindhoven (TUE). Stan Ackermans Instituut. Logistics Management Systems (LMS), 2004, Eindhoven: Technische Universiteit Eindhoven. Stan Ackermans Instituut.

Research output: ThesisPd Eng ThesisAcademic

Planning and control framework at Stork Fokker AESP

de Francisco Campillo, L., 2004, Eindhoven: Technische Universiteit Eindhoven.

Research output: ThesisPd Eng ThesisAcademic

7 Citations (Scopus)
Servers
Queueing networks
Decision making
Simulation
Waiting time

The control of an integrated multi-product multi-machine production-inventory system

Nyen, van, P. L. M., Bertrand, J. W. M., Ooijen, van, H. P. G. & Vandaele, N. J., 2004, Eindhoven: Technische Universiteit Eindhoven. 22 p. (BETA publicatie : working papers; vol. 114)

Research output: Book/ReportReportAcademic

Open Access
File
Open Access
File
Make-to-order
Economic performance
Order processing
2003

Line-of-balance

Ooijen, van, H. P. G., 2003, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

Logistic control of the GLARE factory

Rosado Garavito, M. & Technische Universiteit Eindhoven (TUE). Stan Ackermans Instituut. Logistics Management Systems (LMS), 2003, Eindhoven: Technische Universiteit Eindhoven. Stan Ackermans Instituut.

Research output: ThesisPd Eng ThesisAcademic

15 Citations (Scopus)
Throughput
Processing
Numerical analysis
Workload
Work pressure
Open Access
File
Probability density function
Processing
2002

A logistics redesign of Schiphol Brede Services to improve the punctuality of the KLM

Houben, N. N. P. H. & Technische Universiteit Eindhoven (TUE). Stan Ackermans Instituut. Logistics Management Systems (LMS), 2002, Eindhoven: Technische Universiteit Eindhoven. Stan Ackermans Instituut.

Research output: ThesisPd Eng ThesisAcademic

Line balancing

Ooijen, van, H. P. G., 2002, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie, 8 p.

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional

Simulation results on Albin & Whitt's estimation method for average waiting times in multi product, single server queueing systems

Nyen, van, P. L. M., Ooijen, van, H. P. G. & Bertrand, J. W. M., 2002, Eindhoven: Technische Universiteit Eindhoven. 21 p. (BETA publicatie : working papers; vol. 70)

Research output: Book/ReportReportAcademic

Open Access
File
62 Citations (Scopus)

Workload based order release and productivity : a missing link

Bertrand, J. W. M. & Ooijen, van, H. P. G., 2002, In : Production Planning & Control. 13, 7, p. 665-678

Research output: Contribution to journalArticleAcademicpeer-review

Productivity
Computer simulation
Processing
Workload
Order release
2001
18 Citations (Scopus)
Distribution functions
Economics
Costs
Probability density function
Lead

Effects on arrival rate switching on throughput (times) in production systems with workload dependent processing rates

Ooijen, van, H. P. G., 2001, Proceedings for the International Conference on Industrial Engineering and Production Management, 20-23 augustus 2001. Raulier, D. (ed.). Quebec: IEPM 2001, p. 10-10

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademic

Goederenstroombeheersing : continue processen

Ooijen, van, H. P. G., 2001, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom, p. 36-1-36-6

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

Goederenstroombeheersing : discontinue processen

Ooijen, van, H. P. G., 2001, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom, p. 35-1-35-8

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

2000

Agile manufacturing

Ooijen, van, H. P. G., 2000, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie, p. 1-9

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional

9 Citations (Scopus)

Customer order lead times for production based on leadtime and tardiness costs

Bertrand, J. W. M. & Ooijen, van, H. P. G., 2000, In : International Journal of Production Economics. 64, 1-3, p. 257-265 9 p.

Research output: Contribution to journalArticleAcademicpeer-review

Sales
Costs
Economics
Tardiness
Lead time

Operations sequencing

Ooijen, van, H. P. G., 2000, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie, 9 p.

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional