• 202 Citations
1991 …2019

Research output per year

If you made any changes in Pure these will be visible here soon.

Research Output

2019

Coordinating failed goods collecting and repair capacity policies in the maintenance of commoditized capital goods

van Ooijen, H. P. G., Bertrand, J. W. M. & Büyükkaramikli, N. C., 1 Feb 2019, In : International Journal of Production Economics. 208, p. 29-42 14 p.

Research output: Contribution to journalArticleAcademicpeer-review

1 Downloads (Pure)
2018

The effect of due-date driven capacity adjustments on delivery performance and costs in job shops with exogenous due-dates

van Ooijen, H. P. G. & Bertrand, J. W. M., Feb 2018, 20th International Working Seminar on Production Economics. 10 p.

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademic

2015

Integrating inventory control and capacity management at a maintenance service provider

Buyukkaramikli, N. C., Ooijen, van, H. P. G. & Bertrand, J. W. M., 2015, In : Annals of Operations Research. 231, 1, p. 185-206

Research output: Contribution to journalArticleAcademicpeer-review

7 Citations (Scopus)
10 Downloads (Pure)
2013

Flexible hiring in a make to order system with parallel processing units

Büyükkaramikli, N. C., Bertrand, J. W. M. & Ooijen, van, H. P. G., 2013, In : Annals of Operations Research. 209, 1, p. 159-178 20 p.

Research output: Contribution to journalArticleAcademicpeer-review

4 Citations (Scopus)
3 Downloads (Pure)

Periodic capacity management under a lead-time performance constraint

Büyükkaramikli, N. C., Bertrand, J. W. M. & Ooijen, van, H. P. G., 2013, In : OR Spektrum. 35, 1, p. 221-249 29 p.

Research output: Contribution to journalArticleAcademicpeer-review

Open Access
File
6 Citations (Scopus)
87 Downloads (Pure)
2012

The capacity investment decision for make-to-order production systems with demand rate control

Bertrand, J. W. M. & Ooijen, van, H. P. G., 2012, In : International Journal of Production Economics. 137, 2, p. 272-283 12 p.

Research output: Contribution to journalArticleAcademicpeer-review

2 Citations (Scopus)
3 Downloads (Pure)
2011
Open Access
File
478 Downloads (Pure)
2009

A computational comparison of cyclical and non-cyclical control for stochastic production-inventory systems

Nyen, van, P. L. M., Bertrand, J. W. M. & Ooijen, van, H. P. G., 2009, In : International Journal of Production Research. 47, 16, p. 4609-4627

Research output: Contribution to journalArticleAcademicpeer-review

1 Citation (Scopus)
1 Downloads (Pure)

Supplier managed inventory in the OEM supply chain: The impact of relationship types on total costs and cost distribution

Van Nyen, P. L. M., Bertrand, J. W. M., Van Ooijen, H. P. G. & Vandaele, N. J., 1 Dec 2009, Supply Chain Planning: Quantitative Decision Support and Advanced Planning Solutions. Günther, H. O. & Meyr, H. (eds.). Berlin: Springer, p. 219-246 28 p.

Research output: Chapter in Book/Report/Conference proceedingChapterAcademicpeer-review

Supplier managed inventory in the OEM supply chain : the impact of relationship types on total costs and cost distribution

Nyen, van, P. L. M., Bertrand, J. W. M., Ooijen, van, H. P. G. & Vandaele, N. J., 2009, In : OR Spektrum. 31, 1, p. 167-194 28 p.

Research output: Contribution to journalArticleAcademicpeer-review

5 Citations (Scopus)
6 Downloads (Pure)
2008
16 Citations (Scopus)
5 Downloads (Pure)
2006

A heuristic to control integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times

Van Nyen, P. L. M., Bertrand, J. W. M., Van Ooijen, H. P. G. & Vandaele, N. J., 1 Dec 2006, Stochastic Modeling of Manufacturing Systems: Advances in Design, Performance Evaluation, and Control Issues. Liberopulos, G., Papadopoulos, C. T., Tan, B., MacGregor Smith, J. & Gershwin, S. B. (eds.). Berlin: Springer, p. 253-288 36 p.

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

11 Citations (Scopus)
2 Downloads (Pure)

Economic evaluation of workload control effects

Ooijen, van, H. P. G. & Bertrand, W., 2006, Production Economics : Proceedings of the 14th International Working Seminar. Amsterdam: Elsevier, p. 339-348

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

2005

A heuristic to contol integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times

Nyen, van, P. L. M., Bertrand, J. W. M., Ooijen, van, H. P. G. & Vandaele, N. J., 2005, In : OR Spektrum. 27, 2-3, p. 399-434

Research output: Contribution to journalArticleAcademicpeer-review

11 Citations (Scopus)
4 Downloads (Pure)

The value of coordination in manufacturer-customer relationships

Nyen, van, P. L. M., Bertrand, J. W. M., Ooijen, van, H. P. G. & Vandaele, N. J., 2005, Eindhoven: Technische Universiteit Eindhoven. 29 p. (BETA publicatie : working papers; vol. 151)

Research output: Book/ReportReportAcademic

Open Access
File
43 Downloads (Pure)
2004
7 Citations (Scopus)

The control of an integrated multi-product multi-machine production-inventory system

Nyen, van, P. L. M., Bertrand, J. W. M., Ooijen, van, H. P. G. & Vandaele, N. J., 2004, Eindhoven: Technische Universiteit Eindhoven. 22 p. (BETA publicatie : working papers; vol. 114)

Research output: Book/ReportReportAcademic

Open Access
File
18 Downloads (Pure)
Open Access
File
16 Downloads (Pure)
2003

Line-of-balance

Ooijen, van, H. P. G., 2003, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

16 Citations (Scopus)
1 Downloads (Pure)
Open Access
File
29 Downloads (Pure)
2002

Line balancing

Ooijen, van, H. P. G., 2002, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie, 8 p.

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional

1 Downloads (Pure)

Simulation results on Albin & Whitt's estimation method for average waiting times in multi product, single server queueing systems

Nyen, van, P. L. M., Ooijen, van, H. P. G. & Bertrand, J. W. M., 2002, Eindhoven: Technische Universiteit Eindhoven. 21 p. (BETA publicatie : working papers; vol. 70)

Research output: Book/ReportReportAcademic

Open Access
File
21 Downloads (Pure)

Workload based order release and productivity : a missing link

Bertrand, J. W. M. & Ooijen, van, H. P. G., 2002, In : Production Planning & Control. 13, 7, p. 665-678

Research output: Contribution to journalArticleAcademicpeer-review

64 Citations (Scopus)
7 Downloads (Pure)
2001
18 Citations (Scopus)

Effects on arrival rate switching on throughput (times) in production systems with workload dependent processing rates

Ooijen, van, H. P. G., 2001, Proceedings for the International Conference on Industrial Engineering and Production Management, 20-23 augustus 2001. Raulier, D. (ed.). Quebec: IEPM 2001, p. 10-10

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademic

Goederenstroombeheersing : continue processen

Ooijen, van, H. P. G., 2001, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom, p. 36-1-36-6

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

1 Downloads (Pure)

Goederenstroombeheersing : discontinue processen

Ooijen, van, H. P. G., 2001, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom, p. 35-1-35-8

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

1 Downloads (Pure)
2000

Agile manufacturing

Ooijen, van, H. P. G., 2000, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie, p. 1-9

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional

2 Downloads (Pure)

Customer order lead times for production based on leadtime and tardiness costs

Bertrand, J. W. M. & Ooijen, van, H. P. G., 2000, In : International Journal of Production Economics. 64, 1-3, p. 257-265 9 p.

Research output: Contribution to journalArticleAcademicpeer-review

9 Citations (Scopus)
2 Downloads (Pure)

Operations sequencing

Ooijen, van, H. P. G., 2000, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie, 9 p.

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional

1 Downloads (Pure)

Orderacceptatie en -planning

Ooijen, van, H. P. G., 2000, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie, 9 p.

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional

The impact of work load and routing information on cost optimal lead times

Ooijen, van, H. P. G. & Bertrand, J. W. M., 2000, 11th international working seminar on production economics, Universitaet Innsbruck, Innsbruck, February 21-25, 2000 : pre-prints, vol. 2. Innsbruck: Universität Innsbruck, p. 441-457

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademic

The throughput and order throughput times in production systems wirth workload dependent processing times and workload dependent order arrival rates

Ooijen, van, H. P. G. & Bertrand, J. W. M., 2000, Workshop on production planning and control, 2-4 October 2000, Ateliers de la FUCaM, Mons, Belgium. Mons, p. 90-96

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademic

The throughput and order throughput times in production systems with workload dependent processing times and workload dependent order arrival rates

Ooijen, van, H. P. G. & Bertrand, J. W. M., 2000, Proceedings of the workshop on production planning and control. Mons, Belgium, p. 90-96

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademic

Workload based order release and productivity : a missing link

Bertrand, J. W. M. & Ooijen, van, H. P. G., 2000, Eindhoven: Technische Universiteit Eindhoven. 25 p. (Research Report TUE/TM/LBS; vol. 00-02)

Research output: Book/ReportReportAcademic

1999

Economical due-date setting in job-shops based on routing and workload dependent flow time distribution

Ooijen, van, H. P. G. & Bertrand, J. W. M., 1999, Proceedings of the 4th international conference on industrial engineering and production management, 12-15 July 1999, Glasgow, United Kingdom. Mons: Facultes Universitaires Catholiques de Mons, Vol. 2. p. 358-366

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademic

Exponentiële effening

Ooijen, van, H. P. G., 1999, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie, 10 p.

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional

2 Downloads (Pure)
1998

Capaciteitsmanagement

Ooijen, van, H. P. G., 1998, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie, 9 p.

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional

Delivery performance improvement by controlled work-order release and work-center load balancing

Ooijen, van, H. P. G., 1998, In : International Journal of Production Economics. 56-57, p. 661-675 15 p.

Research output: Contribution to journalArticleAcademicpeer-review

6 Citations (Scopus)

Workflow management

Ooijen, van, H. P. G., 1998, Vraagbaak voor inkoop en logistiek. Alphen a/d Rijn: Samsom Bedrijfsinformatie, 7 p.

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional

1 Downloads (Pure)
1997

Business process re-design: richtingen voor nieuw onderzoek

Kusters, R. J., Eijnatten, van, F. M. & Ooijen, van, H. P. G., 1997, In : Bedrijfskunde : Tijdschrift voor Modern Management. 69, 1, p. 11-17 7 p.

Research output: Contribution to journalArticleAcademicpeer-review

2 Downloads (Pure)

Delivery performance improvement by controlled work-order release and work center loading

Ooijen, van, H. P. G., 1997, Eindhoven: Technische Universiteit Eindhoven. 27 p. (BETA publicatie : preprints; vol. 13)(BETA publicatie : working papers; vol. 8)

Research output: Book/ReportReportAcademic

Open Access
File
34 Downloads (Pure)

Economic lead time determination in hierarchically controlled production systems

Bertrand, J. W. M. & Ooijen, van, H. P. G., 1997, Industrial engineering and production management : proceedings of the IEPM'97 conference, Lyon, October 20-24, 1997 : book 1 / Ed. A. Guinet. Paris: Ed. Hermes, (Journal europeen des systemes automatises; vol. 32, no. 4).

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademic

Open Access
File
32 Downloads (Pure)

Productiviteit

Ooijen, van, H. P. G., 1997, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie, 5 p.

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional

Werklastbeheersing

Ooijen, van, H. P. G., 1997, Vraagbaak voor inkoop en logistiek. Alphen aan den Rijn: Samsom Bedrijfsinformatie, 5 p.

Research output: Chapter in Book/Report/Conference proceedingChapterProfessional

Work-order release based upon a work-center pull strategy

Ooijen, van, H. P. G., 1997, Eindhoven: Technische Universiteit Eindhoven. 23 p. (TUE/TM/BDK/LBS; vol. 97-09)

Research output: Book/ReportReportAcademic

1996

Een logistieke typologie van (gegevensverwerkende) organisaties

Berg, van den, M. J. F. & Ooijen, van, H. P. G., 1996, Eindhoven: Technische Universiteit Eindhoven. 12 p. (TU Eindhoven. Fac. TBDK, Vakgroep LBS : working paper series; vol. 9603)

Research output: Book/ReportReportPopular

Open Access
File
113 Downloads (Pure)